| Model | ZJ 1 |
| Hull Length | ≤ 9 m / 29.5 ft |
| Full Load Displacement | ≤ 5 Tons |
| Rated RPM | 9,900 RPM |
| Angular Momentum | 1,000 Nms |
| Anti-rolling Torque | 3,500 Nm |
| Time to Rated RPM | 20 minutes |
| Time to Stabilization | 10 minutes |
| Start-up Power | 100~900 W |
| Operating Power | 500~700 W |
| Power Input | DC12V 1,200 W |
| Weight | 133 kgs/293 lbs |
| Overall Size(L*W*H) |
Metric(meter)
0.49 x 0.50 x 0.43
Imperial(inch)
19.3 x 19.7 x 16.9
|
| Installation Space(L*W*H) |
Metric(meter)
0.53 x 0.68 x 0.47
Imperial(inch)
20.9 x 26.8 x 18.5 in
|
| Cooling Method | Raw Water -cooled 5L/minutes |
| Ambient Temperature | -20℃~60℃ |
| Noise Output@1 meter | ≤68 dB |
| Protection Rating | IP66 |
| Control Panel | 5-inch Touch Screen |
| Item | Interval | Notes |
|---|---|---|
| Antifreeze top-up | Monthly | Maintain ~90%; if < 60%, locate/repair leaks (user-serviceable). |
| Anode (zinc) | Every 6 months | Replace rod below inlet tee (simple tools; low-cost spare). |
| Water-cooling assembly | Every 12 months | Includes valve/anode; refill & recheck (standardized parts). |
| Flywheel vacuum + helium (models ≤ ZJ20) | Every 12 months | Vacuum-charge-seal under remote guidance. |
| Grease service (models > ZJ20) | Every 100–500 h | Bearings/geartrain with specified grease (e.g., SKF LGHP 2). |
| Gearbox grease replacement (all models) | Every 2000 h | MOLYWHITE RE No.00; add if noise increases. |
Have any questions or need more information? Please fill out the form below and we'll get back to you as soon as possible.